Purpose
Renovations and major construction is required to underpin foundation, repair exterior walls, roof and floor as a result of the shifting (sinking) of the one side of the building, Scope of work includes; Foundation Underpinning, addressing the vertically displaced concrete slab on grade along the south elevation, Exterior Wall Repair, removal and replacement of section of roof and installation of new sloped roof, insulation, parapet/cap flashing., replacement of 10 windows and Interior Repair to walls and floors including drywall and floor coverings resulting from the issues with the foundation.
John Howard Society of Ottawa – Ste. Anne’s Residence × Unknown
1 grants totalling $471.2K
National Infrastructure Contribution Program (NICP)
228 grants totalling $31.9M
Related Grants
| Recipient | Amount | Program |
|---|---|---|
| CRC Madeleine-Carmel | $2.2M | National Infrastructure Contribution Pro... |
| The Governing Council of the salvation Army on behalf of Vancouver Harbour Light | $1.5M | National Infrastructure Contribution Pro... |
| Quint Development Coporation /Quint Développement Corporation | $1.1M | National Infrastructure Contribution Pro... |
| BUILD Inc. | $940.0K | National Infrastructure Contribution Pro... |
| Waseskun Healing Centre / Centre de guérison Waseskun | $640.5K | National Infrastructure Contribution Pro... |